Key facts about Beck Burn

9 turbines

Generating capacity of 30MW
Powering up to 18,000 homes*

£155,250 for investing in the community per year
Site status: in operation
Background: commissioned March 2015
Number and type of turbines: 9 x 3.45MW turbines
Height: tip height of 126.5 metres

Related links
* Load factors based on the five year rolling averages on unchanged configuration basis using Table 6.5 of 'Digest of UK Energy Statistics' - latest figures as per July 2019 release. Based upon the average domestic electricity consumption per home (temperature corrected) per the Energy Consumption in the UK (published July 2019, Table C9 of ECUK: Consumption data tables).