Key facts about Beck Burn

  

9 turbines

Generating capacity of 30MW
Powering up to 18,000 homes*

£155,250 for investing in the community per year

Site status: in operation

Background: commissioned March 2015

Number and type of turbines: 9 x 3.45MW turbines

Height: tip height of 126.5 metres

* Load factors based on the five year rolling averages on unchanged configuration basis using Table 6.5 of 'Digest of UK Energy Statistics' - latest figures as per July 2019 release. Based upon the average domestic electricity consumption per home (temperature corrected) per the Energy Consumption in the UK (published July 2019, Table C9 of ECUK: Consumption data tables).