• Location: Near Garve in the Scottish Highlands

  • Site status: Planning

  • Background: Submitted a consent application to increase the generating capacity of the permitted Corriemoillie Wind Farm to the ECU in March 2016

  • Planned capacity: 13MW, capable of powering up to 7,000 homes*

  • Number of turbines: 19

  • Next steps: A decision is expected in due course

  •  

* Load factors based on the five year rolling averages on unchanged configuration basis using Table 6.5 of 'Digest of UK Energy Statistics' - latest figures as per July 2019 release. Based upon the average domestic electricity consumption per home (temperature corrected) per the Energy Consumption in the UK (published July 2019, Table C9 of ECUK: Consumption data tables).