Key facts

Located near Garve, in the Scottish Highlands

17 turbines

Generating capacity of 47.5MW
Powering up to 28,000 homes*

£242,500 for investing in the community per year

  • Site status: In operation

  • Background: Commissioned January 2017

  • Number and type of turbines: 17 3.2MW turbines

  • Height: tip height of 125 metres

* Load factors based on the five year rolling averages on unchanged configuration basis using Table 6.5 of 'Digest of UK Energy Statistics' - latest figures as per July 2019 release. Based upon the average domestic electricity consumption per home (temperature corrected) per the Energy Consumption in the UK (published July 2019, Table C9 of ECUK: Consumption data tables).