Key facts

Lammermuir Hills in Berwickshire

48 turbines

Generating capacity of 144MW
Powering up to 86,000 homes*

£240,000 for investing in the community per year

  • Site status: In operation

  • Background: Commissioned May 2013

  • Number and type of turbines: 48 3MW turbines

  • Height: Tip heights of 110 - 125 meters

  • £3 million invested into the local economy 
    More than 350 jobs created during construction 

 

* Load factors based on the five year rolling averages on unchanged configuration basis using Table 6.5 of 'Digest of UK Energy Statistics' - latest figures as per July 2019 release. Based upon the average domestic electricity consumption per home (temperature corrected) per the Energy Consumption in the UK (published July 2019, Table C9 of ECUK: Consumption data tables).